As part of numerous large-scale projects, Funkwerk equipped Deutsche Bahn with visual display and information systems – including LCD, TFT, and LED displays. In total, we installed approximately 3,000 of these devices at more than 40 railway stations across Germany.
Another highlight is the installation of over 6,100 dynamic text displays (DAS / DSA+). The devices feature an integrated GSM modem and offer flexible, barrier-free use through an acoustic module added in the second development stage.
Current framework contracts until 2031 ensure the continuous modernization of systems with over 5,000 TFT displays of the ZIM 4 and ZIM 5 generations, as well as comprehensive assembly services with up to 60 projects per year.